Waste animal grease or vegetable oil recycling process to bio-diesel refinery

100TPD biodiesel production plant 7
  • Capacity: 10000 ton to 500000 ton per year
  • Warranty period: 1 year
  • Work pressure: see drawings
  • Max. work temperature: see drawings
  • Operating ambient temperature: see drawings
  • Installation type: site assembly
  • Main process theory: esterification, ester-exchange, ester distillation, methanol recovery, glycerin recovery, and so on.
  • Design working life: 20 years

Delivery list:

  • Boiler
  • Reactor
  • Towers/columns
  • Heat exchange units
  • Medium tanks
  • Vacuum unit
  • Tail gas buffer tank
  • Tail gas recovery and burning unit
  • Smoke de-sulfur tower
  • Pipelines and pipe fittings in the battery limit
  • Instrument and meters
  • Valves
  • Safety valves
  • Sight glass
  • gaskets, bolts and nuts
  • Fans and pumps
  • Electric control cabinet
  • electric cables in the battery limit
  • process and maintenance platform